| Period | Task |
| 2025.05 ~ 2025.10 | BIM on GIS (Cesium) link module for the railway slope simulator |
| 2025.04 ~ 2025.08 | BIM on GIS railway-facility attribute automation program upgrade |
| 2024.08 ~ 2024.10 | BIM on GIS 3D model and attribute management program |
| 2024.04 ~ 2024.10 | Auto mesh generator tool for a rainfall-disaster railway slope simulator |
| 2023.03 ~ 2024.11 | Construction-phase instrument install and management criteria for railway-structure maintenance |
| 2023.01 ~ 2023.12 | Smart maintenance technology for port-infrastructure disaster and aging (year 3) |
| 2023.01 ~ 2023.12 | Long-term behavior analysis and design model for a soft-ground reservoir embankment (year 3) |
| 2022.07 ~ 2022.11 | Urban-rail underground measurement collection and standardized storage module |
| 2022.05 ~ 2022.11 | Reservoir rainfall-slope reinforcement selection and condition-assessment guideline improvement |
| 2022.01 ~ 2022.12 | Smart maintenance technology for port-infrastructure disaster and aging (year 2) |
| 2022.01 ~ 2022.12 | Long-term behavior analysis and design model for a soft-ground reservoir embankment (year 2) |
| 2022.01 ~ 2022.12 | Monitoring plan for a cofferdam reinforced with new geomaterials (year 3) |
| 2021.07 ~ 2021.12 | Infrastructure (railway) status survey and information-collection management strategy |
| 2021.04 ~ 2021.11 | Reservoir rainfall-slope model test and stability assessment method |
| 2021.04 ~ 2021.12 | Smart maintenance technology for port-infrastructure disaster and aging (year 1) |
| 2021.04 ~ 2021.12 | Long-term behavior analysis and design model for a soft-ground reservoir embankment (year 1) |
| 2021.01 ~ 2021.12 | Monitoring plan for a cofferdam reinforced with new geomaterials (year 2) |
| 2021.01 ~ 2021.12 | Map-based risk assessment/management system (year 4) |
| 2020.07 ~ 2020.09 | Woljeonggyo physical-change detection equipment and disaster-prevention system integration |
| 2020.06 ~ 2020.11 | Railway-facility risk model from weather and sensing data |